Zwick Construction has completed many industrial construction projects throughout states like Utah, California, Nevada, and Arizona, including the BYU High Temperature Tunnels Phase 5B.

BYU HIGH TEMPERATURE

TUNNELS PHASE 5B

PROVO, UT: BYU HIGH TEMPERATURE TUNNELS PHASE 5B

OWNER: Brigham Young University

ARCHITECT: Heath Engineering

SIZE: N/A

The contract included the excavation and construction of new, underground concrete tunnel structures to house high-temperature water lines at Brigham Young University.


This phase allowed for the relocation and extension of new lines. The execution required the use of sheet pile shoring on 100% of the excavation.
This project was completed on one of the largest university campuses in the state and required substantial coordination with the owner to maintain an operational campus. This included a precise safety plan, pedestrian and vehicular traffic control, and site cleanliness.

Zwick Construction: Commercial Construction Since 1969